Global Data Center Construction Market, By Design Type (Electrical, Mechanical), Tier Type (Tier 1, Tier 2, Tier 3, Tier 4), Industry Vertical, and Region - Industry Analysis and Forecast to 2025
The global data center construction market is expected to grow from USD 68.93 billion in 2020 to USD 99.27 billion by 2025 at a CAGR of 7.6%.
This market research report provides an in-depth information on trends, dynamics, revenue opportunities, competitive landscape, and recent developments in the global data center construction market. The historic years considered for the study are 2016-2018, base year is 2019, estimated year is 2020, and forecast period is 2021-2025.
Key players operating in the global data center construction market are Corgan Associates, Gensler, AECOM, Holder Construction Group, DPR Construction, Syska Hennessy, Structure Tone, Arup Group, HDR Architecture, Turner Construction, and Page Southerland Page.
Data center construction refers to the collective set of designs and processes to construct a physical data center facility. It includes construction standards that need to be met for efficient and safe operation of the data center.
Critical Questions Answered in the Report
l What are the key trends in the global data center construction market?
l How the market (and its various sub-segments) has grown in the last four years and what would be the growth rate in next five years?
l What are the key strategies adopted by the major vendors to lead in the global data center construction market?
l What is the market share of the top vendors?
The study extensively uses both secondary and primary research methodologies. More than 50 industry experts from different phases of the value chain (supply side, demand side, resellers/distributors, and independent consultants) were interviewed to gain key insights about the market and validate the research findings. Secondary sources referred for the research study include company websites, annual reports, paid database tools, investor presentations, webinars, blogs, news/journals, whitepapers, survey papers, associations, and government websites. All the collected data and insights were then processed using our proprietary data mining software that executes various algorithms to make projections for the forecasted period.
1 Executive Summary
2 Market Introduction
2.1 Definition
2.2 Architecture
2.3 Scope of the Study
2.4 Related Stakeholders
3 Research Methodology
3.1 Introduction
3.2 Primary Research
3.2.1 Key Insights
3.2.2 Breakdown of Primary Interviews
3.3 Secondary Research
3.3.1 Important Sources
3.4 Market Size Estimation Approaches
3.4.1 Top-Down Approach
3.4.2 Bottom-Up Approach
3.4.3 Data Triangulation
3.5 List of Assumptions
4 Market Dynamics
4.1 Introduction
4.2 Drivers
4.3 Restraints
4.4 Opportunities
4.5 Challenges
4.6 Porter's Five Forces Model Analysis
4.7 Value Chain Analysis
4.8 Regulatory Landscape
4.9 Impact of COVID-19 on Global Data Center Construction Market
5 Global Data Center Construction Market, By Design Type
5.1 Introduction
5.2 Electrical
5.3 Mechanical
6 Global Data Center Construction Market, By Tier Type
6.1 Introduction
6.2 Tier 1
6.3 Tier 2
6.4 Tier 3
6.5 Tier 4
7 Global Data Center Construction Market, By Industry Vertical
7.1 Introduction
7.2 BFSI
7.3 IT and Telecom
7.4 Media and Entertainment
7.5 Government and Defense
7.6 Healthcare
7.7 Reail
7.8 Manufacturing
7.9 Energy and Utilities
7.10 Others
8 Global Data Center Construction Market, By Region
8.1 Introduction
8.2 North America
8.2.1 US
8.2.2 Canada
8.2.3 Mexico
8.3 Europe
8.3.1 Germany
8.3.2 UK
8.3.3 France
8.3.4 Italy
8.3.5 Spain
8.3.6 Rest of Europe
8.4 Asia-Pacific
8.4.1 China
8.4.2 India
8.4.3 Japan
8.4.4 South Korea
8.4.5 Rest of Asia-Pacific
8.5 Middle East and Africa
8.6 South America
9 Competitive Landscape
9.1 Introduction
9.2 Vendor Evaluation Criteria
9.3 Vendor Share Analysis, 2019
9.4 Recent Developments, 2017-2020
9.4.1 New Product Launches
9.4.2 Partnerships
9.4.3 Mergers or Acquisitions
9.4.4 Business Expansions
10 Company Profiles
(This section covers the Business Overview, Financial Overview, Product and Service Offerings, Recent Developments, SWOT Analysis, and Key Strategies of the top market vendors. The given sequence does not reprsent their rankings in the market.)
10.1 Corgan Associates
10.2 Gensler
10.3 AECOM
10.4 Holder Construction Group
10.5 DPR Construction
10.6 Syska Hennessy
10.7 Structure Tone
10.8 Arup Group
10.9 HDR Architecture
10.10 Turner Construction
10.11 Page Southerland Page
11 Appendix
11.1 Discussion Guide
11.2 Customization Options
11.3 Related Reports